PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welded embed at pour stops around 2nd floor Facing North (800x600).jpg Welding couplers at pour stops around the 3rd floor Facing West (800x600).jpg Continued prepping for the slab on grade Facing South-East (1) (800x600).jpg Continued welding the roof beams Facing South (800x600).jpg Installed electrical at 4th Floor Facing South (600x800).jpg View of Stair -2 Roof (800x600).jpg
Previous pageNext page Installed electrical at 4th Floor Facing South (600x800)
Installed electrical at 4th Floor Facing South (600x800)